Home
Used
Links
Fishing Boats Used
Bass Boats Used
Team Boats Used
Walleye Used
Fish/Ski Used
Pontoons Used
Deck Boats Used
Runabouts Used
Outboards Tiller
Outboards Remote
Elec Trolling Motor
Trailers Used
Lifts/Docks Used
Props Used
Paddleboats Used
Canoes
Parts Used
New
Links
Fishing Boats New
Bass Boats New
Walleye New
Fish/Ski New
Pontoons New
Outboards New
Docks & Lifts New
MODEL Year Lookup Click here!
|
New showroom/service dept.
|
|
Please
Note: The new building will provide us with much needed space to display
more boats and up to 10 pontoons inside the showroom. It will also include a much larger
service department. It will have
room to have up to seven boats inside the service department at one
time. It also incorporates a large
covered area out side of two south facing service doors. We expect to be able to process more
service boats in a shorter period of time then previously. Our goal had been to have this building
operational for the spring season but due to delays it did not happen. Currently we are planning on being in the
building by June 1, 2006. Due to
code requirements the actual floor plan has changed some from the view seen
in the “Inside floor plan view”. Please email us if you comments. email
|
|
Views and Building Plans
Must have Adobe Acrobat Reader.
|
Aerial View
View looking east from
new location
Outside view. PDF
Inside floor plan view.
PDF
(May load slowly as they are large files.)
|
|
New Showroom is ready
|
1 2 3
4 5
6 7
|
|
June 17th New showroom
|
1 2 3
4
|
|
June 17th, old showroom
|
1 2 3
|
|
May 26th
|
1 2 3
|
|
May 18th
|
1 2 3
4 5
|
|
May 11th
|
1 2 3
4 5
|
|
May 8th
|
1 2
|
|
Connecting to water May 8th
|
1 2 3
4 5
|
|
May 2nd
|
1 2 3
4
|
|
April 26th
|
1 2 3
4
|
|
April 19th
|
1 2 3
4 5
|
|
April 14th
|
1 2 3
4
|
|
April 12th
|
1 2 3
|
|
April 11th
|
1 2 3
4
|
|
April 7th
|
1 2
|
|
April 5th
|
1 2 3
4 5
|
|
April 4th
|
1 2
|
|
March 29th
|
1 2 3
4 5
6
|
|
March 27th
|
1 2 3
|
|
March 24th
|
1 2 3
4 5
|
|
March 23rd
|
1 2 3
|
|
March 22nd Building sides
will be closed in by quitting time.
|
1 2 3
4 5
6
|
|
March 20th
|
1 2 3
4
|
|
March 17th
|
1 2 3
4 5
|
|
March 16th Uncle Greg the foreman and his crew say “HI” to his
nephew Alex.
Alex Click here1
|
1 2 3
4
|
|
March 15th
|
1 2 3
4 5
6 7
|
|
March 14th
|
1 2 3
|
|
March 13th 32˚F 12” Heavy wet snow
|
No pictures due to visibility, but the Lester
crew was still working in the blinding blizzard.
|
|
March 10th 42˚F
Finishing vestibule roof
|
1
|
|
March 9th 44˚F “Some aerial views?”
|
1 2 3
4 5
6
|
|
March 8th Simon Electric
starts, more roofing.
|
1 2 3
4
|
|
March 7 Roof metal going on.
|
1 2
|
|
March 6 It snowed! Simon Electric
moved in and started working, Moderra delivered
decorative rock for the front of the building, note the color.
|
1 2 3
|
|
NFBA Foreman of the Year Award
|
1 Click for picture only 1
2
|
|
March 3
|
1 2 3
4
|
|
March 2
|
1 2
3
|
|
March 2, Gray house south of old
building goes down the road.
|
1 2
3
|
|
March 1 34˚F Setting a rafter
|
1 2
3 4
|
|
Feb 28 30˚F
|
1 2
|
|
Feb 27 36˚F Putting up the
first rafter
|
1 2
3 4
|
|
Feb 23
22˚F Assembling
rafters prior to lifting into place.
Note the numerous hanger brackets.
|
1 2
|
|
Feb 22 5˚F
|
1 2
|
|
Feb 20 26˚F Drilling South
side wall poles.
|
1 2
3 4
|
|
Feb 16 11˚F Setting side wall
poles
|
Morning 1 2 Afternoon 3
4
|
|
Feb 15 06 15 ˚F Lester trucks
have dropped two semi loads of materials with several more to go. One crew is drilling holes preparing for
installing first components. Two
more crews expected next week.
|
5 1
2 3 4
|
|
Feb 7 06 29˚F Gille Excavating doing final grade
to bring building pad to grade.
|
1 2
3 4
|
|
Feb 3 06
17˚F, 14 mph wind. Covering water main.
|
1 2
3 4
|
|
Feb 2, 06 42˚F, clear sky.
Placing water pipe and sewer
line. Perfect weather
|
1 2
|
|
Jan 31, 2006
|
1 2
3 4
5
|
|
Jan 30th, 2006
|
1 2
3
|
|
Dec 24th 2005
|
1 2
3
|
|
Dec 16th, 2005
|
1 2
3 4
|
|
Dec 12th 2005
|
1 2
|
|
|
Dec 8th, 2005
Prep houses for move
|
1 2
3 4
|
|
|
Dec 2, 2005
|
East edge of new lot
looking west to street
More looking to west
Northeast corner looking south
South east corner looking
north
|
|
Email us!
|
Preparing houses for moving.
Stump removal.
November 30, 2005
|
1 2 3 4 5 6
|
|
|
First trees being removed Sept 22 ‘05
|

|
|
|
|
|