Boats, Motors and More!

888/222-DOCK

Inventory lists updated daily!

Home

Used Links

Fishing Boats Used

Bass Boats Used

Team Boats Used

Walleye Used

Fish/Ski Used

Pontoons Used

Deck Boats Used

Runabouts Used

Outboards Tiller

Outboards Remote

Elec Trolling Motor

Trailers Used

Lifts/Docks Used

Props Used

Paddleboats Used

Canoes

Parts Used

New Links

Fishing Boats New

Bass Boats New

Walleye New

Fish/Ski New

Pontoons New

Outboards New

Docks & Lifts New

 

 

 

MODEL Year Lookup Click here!

New showroom/service dept.

Please Note:  The new building will provide us with much needed space to display more boats and up to 10 pontoons inside the showroom.  It will also include a much larger service department.   It will have room to have up to seven boats inside the service department at one time.  It also incorporates a large covered area out side of two south facing service doors.  We expect to be able to process more service boats in a shorter period of time then previously.  Our goal had been to have this building operational for the spring season but due to delays it did not happen.  Currently we are planning on being in the building by June 1, 2006.  Due to code requirements the actual floor plan has changed some from the view seen in the “Inside floor plan view”.  Please email us if you comments. email

Views and  Building Plans

Must have Adobe Acrobat Reader.

Aerial View
 
View looking east from new location

Outside view. PDF

Inside floor plan view. PDF

(May load slowly as they are large files.)

 

New Showroom is ready

1 2 3 4 5 6 7

June 17th New showroom

1 2 3 4

June 17th, old showroom

1 2 3

May 26th

1 2 3

May 18th

1 2 3 4 5

May 11th

1 2 3 4 5

May 8th

1 2

Connecting to water May 8th

1 2 3 4 5

May 2nd

1 2 3 4

April 26th

1 2 3 4

April 19th

1 2 3 4 5

April 14th

1 2 3 4

April 12th

1 2 3

April 11th

1 2 3 4

April 7th

1 2

April 5th

1 2 3 4 5

April 4th

1 2

March 29th

1 2 3 4 5 6

March 27th

1 2 3

March 24th

1 2 3 4 5

March 23rd

1 2 3

March 22nd Building sides will be closed in by quitting time.

1 2 3 4 5 6

March 20th

1 2 3 4

March 17th

1 2 3 4 5

March 16th  Uncle Greg the foreman  and his crew say “HI” to his nephew Alex.

Alex Click here1  

1 2 3 4

March 15th

1 2 3 4 5 6 7

March 14th 

1 2 3

March 13th  32˚F  12” Heavy wet snow

No pictures due to visibility,  but the Lester crew was still working in the blinding blizzard.

March 10th  42˚F Finishing vestibule roof

1

March 9th  44˚F “Some aerial views?”

1 2 3 4 5 6

March 8th   Simon Electric starts, more roofing.

1 2 3 4

March 7 Roof metal going on.

1 2

March 6 It snowed! Simon Electric moved in and started working, Moderra delivered decorative rock for the front of the building, note the color.

1 2 3

NFBA Foreman of the Year Award

1   Click for picture only   1 2

March 3

1 2 3 4

March 2

1  2 3

March 2, Gray house south of old building goes down the road. 

1  2 3

March 1  34˚F Setting a rafter

1  2 3 4

Feb 28 30˚F

1 2

Feb 27 36˚F Putting up the first rafter

1  2 3 4

Feb 23  22˚F Assembling rafters prior to lifting into place.  Note the numerous hanger brackets.

1  2

Feb 22 5˚F

1  2

Feb 20 26˚F Drilling South side wall poles.

1  2 3 4

Feb 16 11˚F Setting side wall poles

Morning 1  2  Afternoon 3 4

Feb 15 06 15 ˚F Lester trucks have dropped two semi loads of materials with several more to go.  One crew is drilling holes preparing for installing first components.  Two more crews expected next week.

5 1  2 3 4

Feb 7 06 29˚F Gille Excavating doing final grade to bring building pad to grade. 

1  2 3 4

Feb 3 06  17˚F, 14 mph wind.  Covering water main.

1  2 3 4

Feb 2, 06 42˚F, clear sky.  Placing water pipe and sewer line.  Perfect weather

1  2

Jan 31, 2006

1  2 3 4 5

Jan 30th, 2006

1  2 3

Dec 24th 2005

1  2 3

Dec 16th, 2005

1  2 3 4

Dec 12th 2005

1  2

 

Dec 8th, 2005

Prep houses for move

1  2 3 4

 

Dec 2, 2005

East edge of new lot looking west to street

More looking to west

Northeast corner looking south

South east corner looking north

Email us!

Preparing houses for moving.

Stump removal.

November 30, 2005

1   2  3  4  5  6

 

First trees being removed Sept 22 ‘05